11/4/2019
诗歌赞美主
Singing and praising to God
11/11/2019
土壤压实
Soil Compaction
2020/2/10
架设钢筋
Steel Erection
2020/2/27
挖土 埋管
Excavation and pipe laying
2020/5/4
灌混凝土
Concrete placing
2020/6/30
砌砖石墙24尺
Building 24-feet stone wall
2020/7/15
二楼跑道钢架
Construction of steel beams for the running track upstairs
2020/8/26
二楼跑道
Running track upstairs installation
2020/9/9
安装隔热
Installing insulation
2020/10/5
污水处理系统
Installation of Wastewater treatment
2020/11/25
再向做工的木匠们传福音
弟兄们再向做工的木匠们传福音,三人受浸
Preaching the gospel to the carpenters
2020/12
屋顶瓦片安装
Preparing roof tile installation
2020/12/15
喷墙第一层
Applying the first coat of stucco for the exterior wall
2020/12/16
喷墙第二层
Applying the second coat of stucco for the exterior wall
2021/1
喷墙第三层
Finishing applying the third coat of stucco for the exterior wall
2021/1/23
偶遇大雨
Heavy rain!
2021/2/8
灌轻水凝土
Pouring the light cement soil
2021/3/4
铺设屋顶砖瓦
Placing the roof tiles
2021/3/21
开始装跑道旁的玻璃
Beginning the glass installation
2021/4/4
为工作团队施工顺利多方代祷
Praying for a smooth construction for the workers
2021/5/1
体育馆主体工程完工 呼召圣徒配搭服事
Building construction completed, saints are called to come to pray
2021/5/11
英语区圣徒配搭服事
Saints from English districts coming to clean
2021/5/26
停车场灯亮了
Lighting up the parking lot
2021/6/8
二楼跑道开始铺
Laying down the running track on the second floor
2021/6/16
冷气机就位
Receiving AC units
2021/6/29
蓄水池开始安装
Beginning construction of the water storage
2021/7/28
种花草
Beginning gardening work
2021/8/6
福音聚会
Gospel meeting for the construction workers
2021/10/29
栽下皂荚木
11/4/2019
从祷告开始
Starting with prayers at the ground breaking
11/11/2019
整地预备
Land Preparation
2020/1/8
挖地基
Foundation Excavation
2020/2/22
盖造六尺砖石墙
Setting up 6-feet stone wall
2020/3/9
铺钢筋水泥地
Reinforced concrete padding
2020/5/5
电梯设备储存
Receiving the elevator equipment
2020/7/22
屋顶钢梁
Construction of roof steel beams
2020/7/31
屋顶
Roof panels installation
2020/9/9
圣徒打扫
Saints coming to clean!
2020/9/20
圣徒打扫
Saints coming to clean round 2!
2020/10/8
向体育馆施工人员传福音
感谢主,2020年10月8日,在二会所有十六位兴建体育馆的工作人员,参加福音聚会。
Preaching the gospel to the construction workers
2020/12/13
LA Fire Department审核通过
Passing the LA Fire Department inspection
2020/12
冷气通风管位置
Installing ventilation ducks for the AC
2020/12
LID水处理计划通过 等待市府盖章授予许可证
Receiving approval and permit for the LID
2020/12/20
体育馆外墙灰泥已完成第三阶段
Starting applying the third coat of stucco
2021/1/17
消防栓的接管和体育馆内外瓦斯工程
Connecting the fire hydrant and installing the gas line
2021/1/24
电梯安装、栏杆装置
Installation of the elevator and the guard railings
2021/2/21
消防栓工程检验通过后的工程
Finishing fire hydrant construction
2021/3/9
体育馆屋顶砖瓦及外墙第四层
Finishing placing the roof tiles and applying the fourth coat of stucco
2021/3/28
为电梯工程的检验通过代祷期间
Praying for the approval of the elevator inspection
2021/4/27
LID工程
Beginning construction for the LID
2021/5/4
铺设储水池,停车场,拆除电器室,储藏室
Installing water tanks, building parking lot, disassembling electrical room and storage room
2021/5/18
LID及室内工程进展
Continuation of the LID construction
2021/5/30
LID排水沟
Trenching for the LID construction
2021/6/16
球场地板开始铺设
Laying down the floor downstairs
2021/6/27
体育馆中间表号
Painting the emblem
2021/7/28
增加蓄水过滤池
Adding additional filter tanks for water storage
2021/7/30
冷气机安装完毕
AC installed
2021/8/17
为着体育馆奉献的祷告
Consecrating prayers for the Blending Center
2021/10/29
蓄水过滤池